{"id":84297,"date":"2018-09-10T15:28:04","date_gmt":"2018-09-11T01:28:04","guid":{"rendered":"https:\/\/www.hawaii.edu\/news\/?p=84297"},"modified":"2019-04-05T15:30:27","modified_gmt":"2019-04-06T01:30:27","slug":"mccarthy-mall-gets-a-facelift","status":"publish","type":"post","link":"https:\/\/www.hawaii.edu\/news\/2018\/09\/10\/mccarthy-mall-gets-a-facelift\/","title":{"rendered":"McCarthy Mall gets a facelift"},"content":{"rendered":"Reading time: <\/span> < 1<\/span> minute<\/span><\/span>
\"tree
糖心Vlog官方<\/abbr> M\u0101noa’s McCarthy Mall<\/figcaption><\/figure>\n

McCarthy Mall<\/a> is looking a little brighter this fall. The highly used thoroughfare leading up to Hamilton Library, Kennedy Theatre and a number of other buildings at the University of Hawaiʻi<\/span> at M\u0101noa<\/a> just completed a facelift over the summer. Recommendations by the newly-created M\u0101noa Campus Brightening Task Force, a partnership comprised of staff and students, identified areas in need of repair and improvements such as McCarthy Mall.<\/p>\n

\"stairs\"<\/a>
Before, left, and after of the stairs by Hamilton Library<\/figcaption><\/figure>\n

The project was completed in four weeks and consisted of repairing, painting, planting and power washing buildings, stairs, benches and walkways, including:<\/p>\n